May 132017
 

Day one is in the the books, I got all the stuff removed from the one side and then proceeded to take down the chain link barrier as well as remove all the wiring for the 5 florescent lights that were installed. Next I started to remove the 3/4 inching flooring which is proving to be challenging as its tongue and groove and was installed from the back to the front. Normally this would not be a problem but when they built it they put the back wall plywood so it’s covering the flooring so its difficult if not impossible to remove. I took out a ton of wood screws and now it looks like I am just going to have to use a skill saw to cut through and break up the flooring so that I can then work on removing the cross beams.

I had to stop for the day as my son needed to borrow the van to move a freezer so we removed the rear seats and put them in the garage. I did not want to use the skill saw and get saw dust all over the seats. Probably good I shut it down for the day as I have a feeling I am going to be sore tomorrow. The good news is I will be taking tomorrow off as we are going to visit my mom in Innisfail for Mothers Day so at least I can recover a bit before getting back to it on Monday. All in all a good first day and to all the moms out there have an awesome day tomorrow!

Leave a Reply

%d bloggers like this: