May 122017
 

I have always wanted to have my own home gym and that dream is finally coming true. I have the lumber arriving this afternoon and then over the course of the next week will work to renovate the space I need. The main gym equipment will be going in on the lower level but in order to do so I need to raise the level of the floor above it about 18 inches. As you can see I have a fair amount of work to do and I will provide updates as I go along. Gym equipment was also ordered today but due to the weight and the size of the order they need to arrange to have it delivered and will let me know when. I do not anticipate it being delivered before I have to go back to work on May 23rd which is fine as I wanted to have everything completed before the equipment arrived.

Leave a Reply

%d bloggers like this: